Install Procedures
AccuMax takes pride in their workmanship and our installs are a work of art. If not installed correctly even the best equipment will not last and over it`s lifetime will cost the homeowner more than they expected.
Equipment installed by AccuMax will run trouble free. We are so confident of this we provide the homeowner with a 5 year labor warranty certificate besides the factory parts warranties.
Select from the following to view our step by step install procedures:
Installing your new furnace:
- Cover flooring path to work site.
- Disconnect, haul away and dispose of all old equipment.
- Inspect new equipment; double check all equipment is correct capacity and model per estimate.
- Clean work area before new equipment is installed.
- Set new furnace and/or coil and level equipment, seal furnace top before evaporator coil is set to prevent air leaks and noise.
- Fabricate custom sheet metal transition to new furnace/coil using 26 gauge “mirror finish” metal. “X” metal to prevent noise and caulk as necessary.
- Replace electrical switch and box, run new wiring as necessary. (both 24v and 120v)
- Replace all drains with 3/4″ PVC and fasten to furnace and/or floor to prevent movement. Install T`s for future cleaning.
- Install new 26 gauge venting per code (80+) Run new PVC venting pitched 1/2″ per foot and prime all connections, cut using power saw for straight, no leak, perfect edges and connections (90+)
- Install new ball gas shut off valves, install drip legs, new unions, and gas lines.
- Braze ( we do not sweat) copper lines to evaporator coil using oxygen/acetylene torch, cover with new insulation if line set not being replaced.
- Attach any filter media and return drop to furnace and seal for quiet operation.
- Properly install any external equipment to work efficiently and in concert with the furnace/AC (humidifier, UV lights, thermostats…)
- Humidistats are always installed in return air duct to properly monitor whole house humidity.
- Make sure equipment not only works perfect but also looks as good.
- After completion check for gas leaks, air leaks, vacuum leaks, water leaks, condensate leaks and CO leaks using electronic detectors where applicable.
- Fire up equipment and test for proper operation. Set up air flow and heat rise. Test and monitor operation for minimum 1/2 hour.
- Explain to customer operation of all equipment, show how to use any programmable thermostats, replace water panels in humidifiers/filtering media, etc Answer any and all questions.
- All dust and debris created by AccuMax to be vacuumed / removed from premises at conclusion of each day”s work.
- All work shall be performed in a professional and workmanlike manner and shall comply with local and state building codes.
Installing your new Air Conditioner
- Recover and dispose of any old freon.
- Disconnect, haul away and dispose of old equipment.
- Put down and level new pad.
- Center and level new AC.
- Install new electrical whip to AC.
- Install new disconnect box where necessary.
- Install new line set as necessary.
- Braze (we do not sweat) all new lines and connection while running nitrogen thru lines to prevent soot build up.
- Install new matching evaporator and make new sheet metal as necessary.
- Run new 3/4″ PVC drains from evaporator.
- Charge refrigerant using superheat/subcooling principles.
- Test operation minimum1/2 hour.
- All dust and debris created by AccuMax to be vacuumed / removed from premises at conclusion of each day”s work.
- All work shall be performed in a professional and workmanlike manner and shall comply with local and state building codes.